Synop

Charge · Orchestrate · Compute · Monetize

Unlock Power at the right place and time

Synop finds the spare capacity on sites you already have and routes every kilowatt to vehicles, compute, or the grid, without waiting on an interconnect upgrade.

  • Utility headroom
  • Battery shave & boost
  • Islanded microgrids
  • Fleet charging + compute
UTILITY SERVICE2.0 / 2.0 MWGENSETStandbyBATTERY · 62%Charging 0.2BUILDING LOADS0.4 MWFLEET CHARGING1.1 MWCOMPUTE0.3 MW
Site load vs. service2 MW service

02:00 Fill the fleetBuilding loads are low, so Synop pours the spare service capacity into depot chargers and tops up the battery.

Work scheduling · on demand

The right work, at the right time

Fleet departures, inference SLAs, training runs, and loads you can't move all share one service. Synop places each job in the hours that meet its deadline at the lowest cost, then re-plans the moment something changes.

Every job lands in its cheapest on-time hours

Vehicles charge on the overnight tariff and the fine-tune fills the leftover headroom. The battery shaves the 16:00–21:00 peak, then refills from spare utility capacity.

Building loads

Unmanaged · always served

Never curtailed

Live inference

Latency SLA · 0.2 MW floor

p95 latency held

Delivery vans · 24

Back 18:00 · depart 05:30

Full at departure · 4.0 MWh

Robotaxis · 18

Back 22:00 · depart 06:00

Full at departure · 2.4 MWh

Model fine-tune

Preemptible · due 12:00

Done 08:00 · 5.0 MWh

Site load

All work, stacked

Supply vs. utility limit

  • Utility
  • Battery
  • Genset
  • Battery charging
  • Utility limit
SLAs met
4 / 4
Peak utility draw
2.0 MW2.4 MW if unmanaged
Served by battery + genset
3.0 MWh
Energy cost vs. unmanaged
-32%$4,116 vs. $6,036

Energy markets

Flexibility the grid will pay for

Synop sells your site's spare capacity back to the grid. No missed departures. No broken SLOs.

Explore Energy Markets

Utility event

Cut load when the utility calls.

Two hours’ notice. The site drops 1.2 MW for the event, and every vehicle still leaves on time.

Site load, 24 h

  • Dispatched
  • Load shed
  • Made up later

What each load does

  • Fleet chargingPushed to after 21:00
    −0.5 MW
  • Training runPaused, resumes at 22:00
    −0.3 MW
  • BatteryDischarges, refills overnight
    −0.4 MW
  • Building loadsUntouched
    —
Flexibility delivered
1.2 MW
Paid for
Every kWh you cut
Where it runs
  • Utility DR
  • CAISO
  • PJM
  • NYISO

Running in production, at scale

Power already permitted and connected at depots across major metros

10+ GWh of energy managed every month and growing, across 800+ sites in major metros. Available to power AVs, compute & batteries immediately

Partnered with WeaveGrid and OptiGrid · Live in ERCOT, PJM, CAISO, NYISO, MISO, SPP, ISO-NE, the UK, and Sweden

Book a demo

Unlock your power stack today

Get in touch to learn more about how Synop can power and monetize your energy assets

What you're exploring